10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Long Lead Shaft Rod, Compatible With CNC And 3D Printers

RON139.00
FREE Shipping

10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Long Lead Shaft Rod, Compatible With CNC And 3D Printers

  • Brand: Unbranded
Sold by:

10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Long Lead Shaft Rod, Compatible With CNC And 3D Printers

  • Brand: Unbranded

RON139.00

Save RON70.00 (33%)

RRP

RON209.00
In stock
FREE Shipping
Sold by:

RON139.00

Save RON70.00 (33%)

RRP

RON209.00
In stock
FREE Shipping

We accept the following payment methods

Description

10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Long Lead Shaft Rod, Compatible With CNC And 3D Printers

This product is a 10mm DC 5V 2phase 4wire linear screw stepper electronic starter. Key benefits and features - Long lead linear screw shaft design for extended travel and smooth linear motion - Enables precise linear movement control with repeatable positioning - 2phase 4wire configuration delivers stable torque and efficient operation with compatible driver boards - 5V DC power supply provides convenient and reliable power input - Compact 10 mm form factor suitable for space-limited applications Why you need it - Precise positioning: The linear screw design combined with a two-phase, four-wire stepper gives controlled, repeatable linear movement for accurate positioning tasks. - Reliable operation: The 2phase 4wire configuration supports stable torque delivery and smooth performance under varying loads. - Easy integration: Runs on a standard DC 5V power source, allowing straightforward wiring and reliable power input. Technical attributes you can rely on - Size: 10 mm - Voltage: DC 5V - Phases: 2 - Wires: 4 - Motion: Linear screw driven actuation with a long lead for greater travel per revolution Compatible uses and scenarios - Small CNC or milling setups that require precise axis actuation in tight spaces - Linear positioning stages in automation, robotics, or lab instruments where repeatable travel is needed - Compact actuators in control systems, educational kits, or prototype development projects Notes on use - Pair with standard 2-phase, 4-wire stepper motor drivers and a 5V control signal to achieve controlled linear motion - Suitable for applications demanding reliable, straightforward 5V power input and steady performance without complex power supply needs This description preserves the original product identity and specifications while presenting clear, customer-focused benefits and practical use cases.
  • Fruugo ID: 375909076-813576131
  • EAN: 758151404085

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Ingredients: pp

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Fri 19 December 2025–Tue 06 January 2026 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • DelightDew
  • Shenzhen Tumi Technology Co., Ltd.
  • 202-03, Jinhe Building, 8 Xinhe Street, Maan Tang, Bantian
  • Longgang, Shenzhen, Guangdong
  • China
  • Shenzhen
  • CN
  • 518129
  • pettynfnef@outlook.com
  • 13332965772

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Synertrade FR SAS
  • Synertrade FR SAS
  • 9 rue du Bat d'Argent
  • Lyon
  • France
  • Lyon
  • FR
  • 69001
  • info@syner-sarl.cn
  • (+33)774555006
  • https://seller.kuajingmaihuo.com/settle/qualification-service